Vescom’s Simple Erection Process

 

1. Bay Framing:

After bays are framed with Vescom composite truss girders and joists, the joist bundles are placed.

 

 

2. Joist Spreading:

Joists are spread to require spacing. NO need for time consuming bridging.

 

 

 

3. Pre-cut decking is placed and welded:

A rugged working platform is now ready for immediate use.

 

 

 

4. Mesh is rolled into place:

Unique top chord design eliminates the need for high chairs.

 

 

 

5. Placing the concrete:

The final step.

 

 

 

6. The Finished Floor:

The finished floor, with no forms to strip, is ready for other trades.

 

 